Metropolis Scab Table

7014 / 7013 SCAB DESIGN
€1,393.24
€1,142.04 Save 18.03%
VAT included

Table Metropolis Scab Design with legs and crosspiece in painted steel, rectangular top in compact laminate.

material samples

Top finish
Structure finish
Model and size

CONTACT US, WE WILL OFFER YOU THE BEST PRICE

Ask for the best price!
Pagamenti sicuri al 100%.Secure payments 100%.
Pay in 3

Metropolis Scab Design Table with Layered Top

The Metropolis Scab Design table is an elegant and refined table inspired by urban and contemporary style. The table features a frame in chromed or painted steel that supports a tabletop made of tempered glass or layered laminate, available in various shapes and sizes. The Metropolis Scab Design table is a versatile and functional table that suits various environments and occasions, both in domestic and professional settings. It's a quality product signed by the SCAB Design Center, offering resilience, stability, and durability. The Metropolis Scab Design table expresses personality and character through its combination of materials and colors. It's a table that doesn't go unnoticed, thanks to its original and innovative design.

Structure of Metropolis Table with Layered Top by SCAB:

Constructed with a crossbeam and legs in matte lacquered steel, available in the following finishes:

  • Matte White
  • Matte Black
  • Matte Taupe

The tabletop is made of 12mm thick compact layered laminate, with tubular reinforcements, featuring either an inclined or flat edge, available in the following finishes:

  • White Core, Black Edge (Inclined Edge)
  • Anthracite Core, Black Edge (Inclined Edge)
  • Cement Effect, Black Core (Inclined or Flat Edge)
  • Taupe Oak, Brown Core (Flat Edge)
  • Beaver Oak (Flat Edge)

Support elements for the tabletop are made of aluminum casting. Adjustable and swiveling feet.

Dimensions and Finishes of Metropolis Table with Layered Top by SCAB:

Dimensions and Finishes of Metropolis Design Table

Delivery Times:

Estimated delivery time for the product: 3-5 working weeks from the date of payment. During this period, deliveries from manufacturers may experience delays.

7014 / 7013